Water security infrastructure · Pakistan
بجلی میں خود کفیل،
پانی میں کیوں نہیں؟
Solar made you independent of the grid. Your water still depends on a tanker, a failing bore, or somebody else's supply line. We assess your property, design one integrated system — source, storage, purification and groundwater recharge — and build it.
PKR 29,500 · adjusted in full against your build contract
Aligned to UN Sustainable Development Goal 6. Target 6.4 calls for a substantial increase in water-use efficiency and a reduction in the number of people suffering water scarcity; Target 6.6 covers the protection and restoration of water-related ecosystems, including aquifers. Every ESpace Water system is designed to report against two measurable numbers: litres of rainwater captured instead of lost to storm drains, and litres returned to the aquifer beneath the property. We publish both on your annual system report.
Why now
The same household that spent PKR 2 million on solar still buys water by tanker in June. Groundwater in the Punjab plain is falling, municipal supply is intermittent, and rain that could be banked runs into the street instead. The fix is not a filter. It is infrastructure.
Groundwater recharge sites reported as established in Islamabad with CDA and FGEHA — the regulatory direction of travel is already set.
Source: PCRWR — verify before publishingRainwater recharged by a single documented recharge-well project over one year, with measured improvement in turbidity and water quality.
Source: PCRWR — verify before publishingSource, storage, purification and recharge are sold separately by four different trades today. Nobody hands the owner one designed system, one contract, one warranty.
ESpace Water thesisWhat we build
Bore assessment or new engineered bore, yield testing, pump sizing, and rainwater catchment from every roof and hard surface on the plot.
Underground reservoirs sized to your actual demand, not a guessed tank. Pressure sets, level control, and dry-run protection.
Treatment specified from your lab report — sediment, hardness, TDS, nitrate, microbiological — not from a catalogue.
Site-specific recharge wells with pre-treatment, built only where the ground and the water quality actually justify it. Never a soakaway with a brochure name.
The ESpace Water Score
Six measured dimensions, scored out of 100 in your assessment. It tells you exactly where the property is exposed — and gives you something to hold us to when the build is finished.
Scores are produced by our engineer on site from bore yield, water testing, roof catchment area, storage volume, household demand and recharge suitability. They are not a marketing estimate.
Packages
Site inspection, bore and source assessment, laboratory water testing, demand calculation, roof catchment survey, recharge feasibility, outline design and budget.
Reservoir, pumping, filtration and treatment, rainwater collection, basic recharge, plumbing integration and commissioning.
The full loop: harvest, pre-filter, recharge, bore and pumping, treatment, reservoir, automation and monitoring. The property stops depending on anyone else.
Civil works, multiple sources, distributed storage, treatment trains and a recharge network — delivered by our own construction teams.
Master-planned water infrastructure across a campus or scheme, with metering, telemetry and an annual audited water balance.
Three costed proposals for your specific property. You choose. No system is built before you sign one.
| Included | Essential | Most chosenIndependence | Premium |
|---|---|---|---|
| Reservoir & pumping | Yes | Yes | Yes |
| Filtration & treatment | Basic | Advanced | Full train |
| Bore | Existing | New / upgraded | Engineered |
| Groundwater recharge | Single point | Yes | Multiple wells |
| Rainwater harvesting | — | Yes | Yes |
| Automation | — | Yes | Yes |
| Remote monitoring | — | — | Yes |
| WaterCare first year | Optional | Optional | Included |
| Indicative | PKR 1.5M | PKR 3.2M | PKR 5.8M |
Indicative ranges for a typical 1–2 kanal property. Your figures come from your own assessment.
ESpace WaterCare
Annual cover: filter and membrane replacement, pump inspection, tank cleaning, laboratory water testing, recharge-well inspection, flow testing, a written system health report, and emergency call-out.
Per year, for a city house on the Secure or Independent package.
Per year, including recharge network inspection and seasonal yield testing.
Per year, with quarterly testing and an audited annual water balance.
How it works
An engineer visits, tests your water, measures your catchment and bore, and scores the property. You receive a written report.
Three costed proposals for your property. Your assessment fee is credited in full against whichever you choose.
Our own civil, plumbing and electrical teams. One contract, one site supervisor, one commissioning certificate.
WaterCare keeps the system performing and re-scores the property every year, so the number you paid for stays true.
بجلی میں خود کفیل ہیں، اب پانی میں بھی خود کفیل بنیں۔
One engineer, one visit, one honest report on where your property stands. PKR 29,500 — credited in full against your build contract.
Book assessment — PKR 29,500Islamabad · Rawalpindi · Lahore — booking now